What needed to be resolved.
Hospital structures demand more than standard commercial slab design. Service penetrations, equipment loadings, vibration control and long clear spans all need to be resolved inside a coordinated PT slab system.
Structural design for 22,000m2 of post-tensioned slab on a $100M private hospital development on the Sunshine Coast.
Current project

Comten's role is framed around the structural decision-making, documentation quality and practical support needed by the project team.
Hospital structures demand more than standard commercial slab design. Service penetrations, equipment loadings, vibration control and long clear spans all need to be resolved inside a coordinated PT slab system.
Comten delivered a post-tensioned slab design package coordinated with the builder and wider consultant team, supporting the long spans and slab thicknesses required by the hospital's functional brief.
The project demonstrates Comten's ability to deliver PT slab design at the scale and complexity usually associated with larger engineering consultancies.
Start with a clear conversation about the project, the issue and the next practical step.